Laserfiche WebLink
NewFields <br /> Perspective.Vision.Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek &Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date:August 14, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 55°F to High: 80°F Weather: Sunny with afternoon thunderstorms <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Roxanne Li 3 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer was used to construct a pipe bench along the 9900' elevation. <br /> The VLF2 Recertification Project was completed. <br /> t2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. The project is complete and this <br /> ' will be the final Daily Reports for the project. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> ' NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 T.720.508.3300 <br />