My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:34:04 AM
Creation date
9/11/2018 4:28:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 2 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date: August 8, 2018 <br /> S M T W T F S <br /> ' Temperature: Low:44°F to High: 65°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> A 312C L excavator was used to remove the DCF on the Northeast corner of the Geomembrane <br /> ' Recertification VLF2 to locating damaged geomembrane. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.