Laserfiche WebLink
■NewFields <br /> 1 Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date: August 7, 2018 <br /> ' S M T W T F S <br /> Temperature: Low:45°F to High: 64°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer and 312C L excavator were used to place Drain Cover Fill (DCF) up the slope <br /> ' between panels PRC-33 and 41. Ames will remove the DCF on the Northeast corner to find the <br /> damaged geomembrane tomorrow. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> ' 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />