Laserfiche WebLink
■NewFields <br /> ' Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number:475.0106.026 <br /> ' Date: August 3, 2018 <br /> ' S M T W T F S <br /> Temperature: Low:47°F to High: 67°F Weather: Mostly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 8 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer and 312C L excavator were utilized to place DCF up the slope between panels <br /> ' PRC-37 and 41. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> tNewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> 1 Construction. <br /> ' www.NewFields.com 9400 00 <br />