Laserfiche WebLink
■NewFields <br /> ' Perspective.Vision.Solutions, <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date: August 2, 2018 <br /> S M T W T F S <br /> ' Temperature: Low:52°F to High: 73°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer and 312C L excavator were utilized to place DCF up the slope between panels <br /> ' PRC-33 and 36. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> ' Construction. <br />