Laserfiche WebLink
r m NewFields <br /> Perspective.Vision. Solutions. <br /> r <br /> rFIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> rDate: August 1, 2018 <br /> rS M T W T F S <br /> ' Temperature: Low: 48°F to High: 71°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> rBenjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill (DCF) Placement <br /> A Cat D6T LGP dozer and 312C L excavator were utilized to place DCF up the slope between panels <br /> r PRC-27 and PRC-32. A DCF road was also constructed on the 9850' bench to allow for material <br /> delivery. <br /> r2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> r3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> rConstruction. <br /> 1 <br /> r <br /> •,00 Station St,Lone Tree,Colorado:0 00 <br /> r <br /> 1 <br />