Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> tProject: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 30, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 39°F to High: 68°F Weather: Mostly Cloudy/Rain <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> The WA470 Komatsu loader was used to deliver the DCF material to the placement area on 9750' <br /> bench. Ames continued Drain Cover Fill (DCF) placement using a CAT D6 LGP dozer. DCF material <br /> was delivered and stockpiled near the recertification area by mine operations traveling on at least <br /> 20-feet of geomembrane cover. <br /> ' 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />