My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:28:45 AM
Creation date
9/11/2018 4:23:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 1 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br /> NewFields <br /> 0 Perspective.Vision.Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date: July 25, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 43°F to High: 73°F Weather: Partly Cloudy/rain <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> The WA470 Komatsu loader was utilized to deliver the Drain Cover Fill (DCF) to the placement <br /> area on 9750' bench. A Cat D6T LGP dozer was used for DCF placement and was pushing up the <br /> slope between panels PRC-20 to PRC- 23. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement during the shift. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.