Laserfiche WebLink
NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 23, 2018 <br /> S M T W T F S <br /> Temperature: Low: 48°F to High: 67°F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 4 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' A CAT 312C L was used to backfill the previously exposed geomembrane at the North corner of <br /> 9750' bench. <br /> 1.1 Drain Cover Fill Placement <br /> No activities during the shift. <br /> NewFields Activities <br /> NewFields personnel observed the exposed geomembrane backfill during the shift. <br /> 2.0 COMMUNICATIONS AND MEETINGS <br /> ' NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 T.720,508.3300 <br />