Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date:July 21, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 52°F to High: 68°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 4 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' After geomembrane repairs were vacuum tested and approved, a CAT D6T LGP dozer was used <br /> to backfill the nuclear density test holes. <br /> ' 1.1 Drain Cover Fill Placement <br /> No activities during the shift. <br /> 2.0 COMANCO ACTIVITIES <br /> ' 2.1 Geomembrane Repairs <br /> Comanco performed geomembrane vacuum testing in accordance with the technical specifications and <br /> ' passing results. <br /> Comanco demobilized from site after the shift. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed test hole backfill, geomembrane vacuum testing, and approved <br /> geomembrane repairs during the shift. <br /> 1www.NewFields.com9400 Station . Colorado:1720.508.3300 <br />