My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:28:45 AM
Creation date
9/11/2018 4:23:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 1 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> 1 Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number: 475.0106.026 <br /> ' Date:July 20, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 47°F to High: 64°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Soil Liner Fill (SLF) Density Testing <br /> A CAT 321C L excavator was utilized to remove Drain Cover Fill (DCF) from the recently installed <br /> ' geomembrane between 9673' and 9716' elevation. Four test holes were excavated. The <br /> geomembrane was cut to expose SLF for density and moisture testing. The density and moisture <br /> testing were performed using the CPN Nuclear Moisture/Density Gauge with passing results. <br /> 1.2 Drain Cover Fill Placement <br /> No activities during the shift. <br /> COMANCO ACTIVITIES <br /> ' Comanco cut the geomembrane to expose the SLF for density tests. After the tests were <br /> complete, Comanco repaired the geomembrane at each test hole location. Repairs were <br /> performed using the extrusion welding method in accordance with the technical specifications. <br /> ' Vacuum testing was not performed during the shift and the will be performed on July 21, 2018 <br /> prior to backfilling test holes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.