Laserfiche WebLink
NewFields <br /> Perspective.Vision.Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: Geomembrane Recertification VLF2 <br /> NewFields Project Number:475.0106.026 <br /> ' Date:July 16, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 50°F to High: 63°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> ' Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> Mine operations delivered and stockpiled DCF material near the recertification area traveling on <br /> at least 20-feet of geomembrane cover. The WA 470 Komatsu loader was utilized to deliver the <br /> DCF to the placement area on 9750' bench. A Cat D6T LGP dozer continued to place and pushed <br /> the Drain Cover Fill (DCF) up the slope on Panels PRC-17 and 18. <br /> ' 2.0 COMANCO ACTIVITIES <br /> ' 2.1 Geomembrane Acceptance. <br /> Panels PRC-33 thru PRC-41 were inspected and approved for DCF placement by CC&V, Ames, <br /> Comanco, and NewFields representatives. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed DCF placement. <br />