Laserfiche WebLink
■NewFields <br /> ' Perspective.Vision.Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> ' Date:July 10, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 50°F to High: 73°F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 12 <br /> Alex Lewallen 0 <br /> 1.0 AMES <br /> ' 2.0 CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' Mine Operations delivered Drain Cover Fill (DCF) from the stockpile to the loading area. The <br /> loader was used to deliver the DCF to placement area on 9750' bench. A Cat D6T LGP dozer was <br /> utilized to build the ramp on 9750' bench using DCF material. <br /> 1.2 Anchor Trench backfill <br /> ' A CAT 312C L excavator equipped with vibratory plate compactor and the labor guys were used <br /> to backfill the anchor trench on 9900' bench. The temporary anchor trench was completed with <br /> ' the last layer of soil liner fill (SFL) according to project specification. <br /> 2.1 Geomembrane Acceptance <br /> No activities during shift <br />