Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date:July 9, 2018 <br /> S M T W T F S <br /> tTemperature: Low: 50°F to High: 74°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 13 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> Ames continued Drain Cover Fill (DCF) placement using a CAT D6 LGP dozer. DCF material was <br /> delivered and stockpiled near the recertification area by mine operations traveling on at least 20- <br /> feet of geomembrane cover at all times. <br /> ' 1.2 Anchor Trench backfill <br /> Anchor trench was backfilled on 9900' bench using a CAT 312C L excavator equipped with <br /> vibratory plate compactor and laborers. Approximately 25 feet of temporary anchor trench was <br /> completed with the placement of Soil Liner Fill (SLF) in accordance with technical specification. <br /> ' 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> ' Panels PRC-17 thru PRC-32 were inspected and approved for DCF placement by CC&V, Ames, <br /> Comanco, and NewFields representatives. <br /> ' www.NewFields.com 9400 Station St,Lone Tree,Colorado 8012400 <br />