Laserfiche WebLink
NewFields <br /> ion.Solutions. <br /> ' August 17, 2018 <br /> NewFields Project No. 475.0106.026 <br /> ' Newmont Mining Corporation <br /> Cripple Creek &Victor Gold Mine <br /> P.O. Box 191 <br /> ' Victor, Colorado 80124 <br /> Attention: Laurin Colby <br /> ' Senior Metallurgist <br /> Re: RECORD OF CONSTRUCTION REPORT <br /> ' VLF2 Recertification Project <br /> Drain Cover Fill 9750' -9900' Elevations <br /> ' Dear Mr. Colby, <br /> t NewFields performed Construction Quality Assurance (CQA) activities during the VLF2 <br /> Recertification Project, observing and documenting the placement of Drain Cover Fill (DCF) over <br /> the geomembrane certified in the VLF2 Recertification Project Record of Construction Report for <br /> ' Subgrade and Geomembrane 9750'-9900' Elevations.The DCF placement occurred between June <br /> 26, 2018 and August 13, 2018. <br /> ' This letter serves as a record of construction report for the VLF2 Recertification project and <br /> certifies the construction activities for the DCF placement between the 9750' and 9900' <br /> ' elevations. All construction activities were observed and verified to be in accordance with the <br /> approved Squaw Gulch VLF Technical Specifications revised and re-issued for construction on <br /> August 25, 2016. <br /> 1.0 DRAIN COVER FILL PLACEMENT <br /> ' Ames Construction placed approximately 7,650 cy of DCF within the VLF2 Recertification area <br /> between the 9750'and 9900'elevations in accordance with the Technical Specifications. Crushed <br /> overburden material from the Cresson Project was processed between September 2013 and <br /> November 2014. All oversized material was removed from the overburden by screening the <br /> material over a vibrating 1 % inch screen. After processing, the DCF was stockpiled in a local <br /> ' stockpile designated by CC&V located north of VLF2. <br /> 1 <br />