Laserfiche WebLink
NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> 1 Date:July 7, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 53°F to High: 77'F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 12 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Drain Cover Fill Placement <br /> Placement continued by pushing a two-foot lift of DCF between 9650' and 9750' bench, using a <br /> CAT D6 LGP dozer. <br /> 1.2 Anchor Trench backfill <br /> ' An excavator was used to backfill the anchor trench to one foot depth using DCF. <br /> ' 1.3 Geomembrane Removal <br /> No activities during the shift <br /> 2.0 COMANCO ACTIVITIES <br /> ' 2.1 Geomembrane Acceptance <br /> No new activities during this shift <br /> Coloradowww.NewFields.com 9400 Station St,Lone Tree, 8012400 <br />