Laserfiche WebLink
Vo m e r P I t — • — • — • - Original Permit Boundary = 80 acres <br /> Schmidt Construction Company 1 Land Requested for FIRST 2018 Release (measurements shown are approximate) _ <br /> 26.2 acres. None of this land has ever been affected b mining. APPROVED. <br /> Second Release Map '' g <br /> September 2018 Remaining Affected Land to be Reclaimed = 45.2 acres <br /> Permit: M-83-035 <br /> Land Requested for SECOND 2018 Release = 8.6 acres. <br /> (berms in this area were approved to remain and be released in TR05). <br /> NOTE: All measurements are approximate and are derived from the FIRST 2018 RELEASE. <br /> N <br /> 1" = 400' <br /> 0 200 400 <br /> o - <br /> r. 9) O) <br /> fl <br /> *.NNW ■ ■ <br /> Ross* <br /> - r <br /> RECEIVED <br /> Note on Future Reclamation: The 50' setback from actual disturbed land is provided for access for <br /> reclamation of the disturbed land. SEP 10 201 <br /> ;TON <br /> ph/1310N OF RECt.l <br /> Note: This is a newly formatted " <br /> MINING&SAr" <br /> map produced on a 2017 satellite <br /> image. <br />