Laserfiche WebLink
036 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />1 <br />5.55 <br />$8,133.00 <br />Job superintendent: <br />Reclamation <br />Total = <br />Profit: <br />10.00 <br />Total = <br />037 <br />1 <br />$2,407.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />4.55 <br />Removal <br />038 <br />1 <br />$10,750.00 <br />Mobilize/Demobilize Equipment for Site <br />MOBILIZE <br />9.55 <br />Maintenance <br />039 <br />1 <br />$34,540.00 <br />10 year site maintenance <br />SITEMAINT <br />0.00 <br />ENANCE <br />SUBTOTALS: <br />964.68 <br />$345,050 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />Performance bond: <br />1.05 <br />Total = <br />Job superintendent: <br />482.32 <br />Total = <br />Profit: <br />10.00 <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />6.59 <br />4.89 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />$6,970.01 <br />$3,623.03 <br />$35,233.48 <br />$34,505.00 <br />$80,331.52 <br />$425,381.52 <br />500.00 <br />$28,032.64 <br />$20,801.16 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $129,665.32 <br />TOTAL BOND AMOUNT (direct + indirect) = $474,715.32 <br />