Laserfiche WebLink
MOTOR GRADER WORK <br />Task description: Finish Grade All Backfilled Areas <br />Site: McClave Canyon Mine <br />Permit Action: RN8 <br />PROJECT IDENTIFICATION <br />Task #: 014 State <br />Date: 9/5/2018 County <br />User: TNL <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Colorado <br />Garfield <br />ffltiuv <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: 014 <br />Basic Machine: CAT 12M Horsepower: <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />I so [111].711'd 9 till 11IM Y (I],I <br />6.09 <br />19 <br />Estimate <br />158 <br />1 per day <br />(CRG) <br />acres <br />Average Grader Speed: <br />1.50 <br />Utilization % <br />Ownership Cost/Hour: <br />$30.73 <br />NA <br />Operating Cost/Hour: <br />$30.60 <br />100 <br />Ripper Ownership Cost/Hour: <br />$2.17 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$28.69 <br />NA <br />Total Unit Cost/Hour: <br />$92.19 <br />Job Condition Correction Factors <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />I so [111].711'd 9 till 11IM Y (I],I <br />6.09 <br />19 <br />Estimate <br />158 <br />1 per day <br />(CRG) <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />10.40 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.40 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.5273 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.2982 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.2982 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />4.69 Hours <br />Unit cost: $71.01 per acre <br />Total job cost: <br />$432 <br />