Laserfiche WebLink
BULLDOZER WORK <br />Task description: Recontour Main Haul Road Surfaces <br />Site: McClane Canyon Mine Permit Action: RN8 <br />PROJECT IDENTIFICATION <br />Task #: 013 <br />Date: 9/5/2018 <br />User: TNL <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/flour: <br />Ripper op. Cost/Hour: <br />Operator Cost/flour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Permit/Job#: C1980004 <br />$110.70 <br />Utilization % <br />NA <br />$95.46 <br />100 <br />$12.36 <br />NA <br />$0.00 <br />0 <br />$41.52 <br />NA <br />$260.05 <br />$260.05 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,500 <br />Swell factor: 1.165 <br />Loose volume: 6,408 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1.243.2 LCY/hr <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,600 feet <br />lbs/LCY <br />fill or embankment 0.9 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Abbreviation: None <br />Filename: 013 <br />0.750 <br />AVG.) <br />0.900 <br />(CAT HB <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />