My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-07_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2018-09-07_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 9:44:02 AM
Creation date
9/11/2018 8:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
9/7/2018
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Tabetha Lynch
To
Clayton Wein
Type & Sequence
RN8
Email Name
TNL
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip CmClane to Munger Haul Road <br />Site: McClave Canyon Mine Permit Action: RN8 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: Colorado <br />Date: 9/5/2018 County: Garfield <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 139T - 9SU <br />Ripper Attachment: 3 -Shank Ripper <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: 009 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />NA <br />BCY NA <br />Area: 0.48 acres Rip Depth (ft): <br />2.00 <br />Utilization % <br />Ownership Cost/Hour: <br />$110.70 <br />NA <br />Operating Cost/Hour: <br />$95.46 <br />100 <br />Ripper Ownership Cost/Hour: <br />$12.36 <br />NA <br />Ripper Operating Cost/Hour: <br />$7.88 <br />100 <br />Operator Cost/Hour: <br />$41.52 <br />NA <br />Total Unit Cost/Hour: <br />$267.92 <br />Average Ripping Width: <br />Total Fleet Cost/Hour: <br />$267.92 <br />Average Ripping Length: <br />200.00 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />feet <br />Average Maneuver Time: <br />Seismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 0.48 acres Rip Depth (ft): <br />2.00 <br />Volume: 1,549 <br />Source of estimated quantity: Figure 2-2-2; Operator Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.63 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.838 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.838 <br />Acres/hr <br />Site Altitude: <br />5,600 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.70 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.70 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />0.69 Hours <br />BCY or CCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.