Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.70 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Site Altitude: 5600 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.79 <br />Haul Time: 0.79 minutes <br />Return Rrnrte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.41 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 452.40 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.689 <br />0.41 <br />minutes <br />2.50 <br />minutes <br />375.49 <br />LCY/Hour <br />1 <br />Scraper(s) <br />375.49 <br />LCY/Hour <br />375.49 <br />LCY/Hour <br />Team(s) Total job time: 24.97 Hours <br />/LCY Total job cost: $6,460 <br />