Laserfiche WebLink
COMPACTION WORK <br />Task description: Spread and Compact Uncompacted Refuse Coal Mine Waste Pile <br />Site: McClane Canyon Mine <br />PROJECT IDENTIFICATION <br />Task #: 006 <br />Date: 9/5/2018 <br />User: TNL <br />Permit Action: RN8 <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: 006 <br />Basic Machine: CAT 815F Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 5,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 4,350 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />Utilization % <br />Ownership Cost/Hour: <br />$56.28 <br />NA <br />Operating Cost/Hour: <br />$65.66 <br />100 <br />Operator Cost/Hour: <br />$26.14 <br />NA <br />Total Unit Cost/Hour: <br />$148.08 <br />Total Fleet Cost/Hour: <br />$148.08 <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 5,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 4,350 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />4.00 <br />mph <br />10.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />5 <br />passes <br />847.60 <br />CCY/hour <br />Site Altitude: <br />5,600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Compactor(s) <br />Unit cost: $0.210 per CCY <br />703.51 CCY/Hour <br />703.51 CCY/Hour <br />Total job time: 6.18 Hours <br />Total job cost: $916 <br />