disturbance than the cross country travel of the installation equipment. Further, previously <br />undisturbed areas that were compacted by overland vehicle travel were scarified to a depth of 6" <br />and reseeded with the permanent seeding mix. <br />Future power requirements B -Vent Shaft #1 may require construction of 3400 feet of overhead <br />electric utility lines (Map 151). In addition, 2250 feet of electrical lines are also needed for the <br />lighting and fuel pumping at SH -2, nitrogen unit at RDH -3 and for fluid handling at SH -2 (Map <br />155). 520 feet of electrical lines are needed to serve the facilities by RDH -4 (Map 158). Raptor <br />proof poles will be used to minimize electrocution hazards. <br />111.13.2 Water Sugn)N Water for the mine was initially obtained through alluvial wells. The well <br />water was very high in salinity. Hence, the water is now primarily obtained from a surface lagoon <br />created near the well houses. The lagoon collects water from the White River. BME has all the <br />necessary water rights to pump this water and use it for industrial purposes. This water is <br />delivered by pipeline to the D Portal Area as shown in the water balance, Figure III -5. <br />A portion of the water pumped to the D Portal Area is treated by a reverse -osmosis water <br />treatment plant and stored in a 40,000 -gallon tank for use as potable water. The remaining portion <br />is pumped directly into a 1,600,000 -gallon head tank. Water from this tank is used as makeup <br />water in the preparation plant as well as fire protection and dust suppression water throughout the <br />mine and surface facilities. <br />111.10.3 Sewaae Treatment A mechanical sewage treatment plant has been constructed within <br />the D Portal area. The effluent, approximately 1,800 gallons per day, will be pumped to the <br />process settling pond in that area. Water from this pond is either used for firewater, dust control or <br />as makeup water for the coal preparation plant. <br />III.D.4 Telecommunication A telecommunication and radio repeater site has been installed <br />along the access road to the water storage area. These facilities aid in field communication at the <br />mine and with the loadout facilities and power plant. <br />III.E Coal Loadout and Railroad Facilities <br />From the slot storage coal is conveyed to the loadout tower for loading into rail cars. Authority <br />under the mining permit ceases once the coal is placed in the rail car. A decision by the Interior <br />Board of Land Appeals (IBLA) affirmed a decision from the Acting Director, Office of Surface <br />Mining Reclamation and Enforcement (OSM), finding that a railroad and a pipeline, used to <br />Permit Renewal #6 (04/2014) III -34 <br />