Laserfiche WebLink
19 <br />Drainage design for the 0.2 mile long light use road that provides access to slurry <br />wells S2 and S3 is shown on Map 14. Drainage designs for the RDA light use roads <br />that provide access to the cell repeater are shown on Map 13. <br />No surfacing will be utilized for the light use roads. The light use roads will be <br />maintained adequate for the intended use of the roads. A light use road damaged by <br />a catastrophic event will be repaired as soon as is practicable after the damage has <br />occurred. <br />Light Use Road Reclamation <br />Light use roads will be reclaimed. <br />The Bates Portal light use road will be reclaimed in conjunction with the reclamation <br />and backfilling of the Bates Portal. <br />The temporary light use road located in the lower reaches of the RDA #1 expansion <br />area will be reclaimed following its use. Test pits will be backfilled and returned to <br />AOC. The area will be seeded and mulched. <br />RDA Feed Belt for Development Waste Rock <br />This beltline transfers development waste up to the existing RDA beltline and to the <br />RDA (Refuse Disposal Area). This belt will be removed and the surface reclaimed <br />when the belt line is removed from service. <br />This belt system consists of bolt together structure mounted on stands. At locations <br />where the beltline crosses a drainage system the belt structure will be suspended from <br />cables that are anchored on either side of the drainage system. The belt will have <br />spillage containment devices to prevent any spillage from entering/contaminating any <br />drainage not reporting to Pond 007. <br />The belt will run from east to west starting at the RDA belt and set approximately <br />parallel to and south of Highway 12 and north of the Purgatoire River. <br />(d) Remote Rail Load out at Jansen <br />NECC will use the existing Jansen industrial site located approximately one mile <br />southwest of Trinidad Colorado as a temporary coal load out facility for New Elk <br />Mine. Exhibit 40 Jansen Load out contains a detailed description of all facilities and <br />associated modifications related to the load out facility. In general, a retaining wall, <br />truck weight station, feed hopper, conveyor belt, and load out bin will be constructed. <br />This load out facility will be temporary and will be used in an interim period until <br />NECC can complete construction of the railroad to the mine. It is anticipated that <br />this temporary load out facility would be used until 2012. <br />Section 2.05 RN -6 10/17/2016 <br />