Laserfiche WebLink
SW'/4 SW'/4 SECTION 15 <br />SWI/4 SW'/4 SECTION 22 <br />SEI/4 NEI/4 SECTION 28 <br />SWI/4 SEI/4 SECTION 28 <br />EI/2 NWI/4 SECTION 33 <br />WI/2 SWI/4 SECTION 33 <br />THE ADDITIONAL STUDY DATA WILL BE FORWARDED TO THE COLORADO <br />HISTORIC SOCIETY FOR THEIR EVALUATION AND A DETERMINATION OF <br />THE PROPER COURSE OF ACTION REQUIRED. <br />7. THE COLOWYO COAL COMPANY SHALL SUBMIT A TECHNICAL REVISION <br />TO THE DIVISION WHICH PROVIDES AN ANALYSIS OF GROUNDWATER <br />POINTS OF COMPLIANCE AT THE COLOWYO MINE PURSUANT TO RULE <br />4.05.13(1). THIS ANALYSIS WILL BE DONE IN CONSULTATION WITH THE <br />DIVISION AND WILL INCLUDE A WRITTEN DETERMINATION OF THE NEED <br />FOR GROUNDWATER POINTS OF COMPLIANCE AT THE MINE. IF DEEMED <br />APPROPRIATE, BASED ON THIS ANALYSIS, COLOWYO SHALL ESTABLISH <br />ONE OR MORE POINTS OF COMPLIANCE FOR THE COLOWYO MINE. <br />19. DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR REVISION <br />BE SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION <br />2.03. 10 OF VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY <br />CONSTRUCTION OF ANY DEWATERING WELLS ASSOCIATED WITH THE <br />COLLOM PIT IS ALLOWED TO OCCUR. <br />20. A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING <br />WELLS MUST BE IN PLACE, AND A MINOR REVISION TO THE PERMIT <br />SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03. 10 <br />OF VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY <br />PUMPING FROM WELLS ASSOCIATED WITH THE COLLOM PIT IS ALLOWED <br />TO OCCUR. <br />23. AN INDIVIDUAL DISCHARGE PERMIT MUST BE IN PLACE, AND A MINOR <br />REVISION TO THE PERMIT SUBMITTED AND APPROVED BY THE DIVISION <br />TO UPDATE SECTION 2.03. 10 OF VOLUME 1 OF THE PERMIT APPLICATION <br />PACKAGE, BEFORE OVERBURDEN STOCKPILING WITHIN THE COLLOM <br />TEMPORARY SPOIL PILE (NOT INCLUDING TOPSOIL REMOVAL, SEDIMENT <br />POND DEVELOPMENT OR ACCESS/HAUL ROAD DEVELOPMENT) CAN <br />OCCUR. <br />