Laserfiche WebLink
discharge of process water from the site. The operation will not intercept the regional <br /> ground water table or impact ground water. (Please see Exhibit G, Section 6.4. 7 (1) <br /> for a full discussion) <br /> (c) Compliance with applicable federal and Colorado dredge and fill <br /> requirements: <br /> There are no known wetlands or other areas which require compliance with applicable <br /> federal and Colorado dredge and fill requirements. However, SEMA will comply <br /> with all applicable Federal and State dredge and fill regulatory requirements where <br /> necessary. <br /> (d) Removing temporary or large siltation structures form drainageways after <br /> disturbed areas are revegetated and stabilized, if required by the Reclamation <br /> Plan: <br /> No temporary or large siltation structures are anticipated within associated <br /> drainageways. <br /> (2) Earth dams, if necessary to impound water, may be constructed if the <br /> formation of such impoundments will not damage adjoining property or <br /> conflict with water pollution laws, rules or regulations of the federal <br /> government, the state of Colorado or with any local government pollution <br /> ordinances: <br /> No such structures are proposed for the borrow pit operation. <br /> (3) All surface areas of the affected land, including spoil piles, shall be stabilized <br /> and protected so as to effectively control erosion: <br /> All surface areas of the affected land will be stabilized and protected so as to effectively <br /> control erosion through implementation of our Corporate Stormwater Management Plan, <br /> where required. There will be no spoil piles associated with this operation. (Please see <br /> Section 3.1.5 (10) above) <br /> 3.1.7 Groundwater—Specific Requirements <br /> (1) Standards and conditions applicable to classified and unclassified groundwater. <br /> N/A <br /> (2) Establishing permit conditions, including numeric protection levels, protective of <br /> unclassified groundwater uses. <br /> N/A <br /> (5) Any Operator, on a voluntary basis, may submit information concerning the <br /> 31 <br />