My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-06_PERMIT FILE - M2018048
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018048
>
2018-09-06_PERMIT FILE - M2018048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 3:52:29 AM
Creation date
9/7/2018 11:46:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018048
IBM Index Class Name
PERMIT FILE
Doc Date
9/6/2018
Doc Name
Application
From
Weld County
To
DRMS
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Supplement B to the Mining Plan) <br /> Section 3.1 Performance Standards: <br /> 3.1.4 Public Use: <br /> On lands owned by the Operator, the Operator may permit the public to use the same <br /> for recreational purposes, except in areas where such use is found by the Operator to <br /> be hazardous or objectionable. <br /> The public will not have access to the site since it is private land. <br /> 3.1.5 Mining Measures—Materials Handling: <br /> (2) When backfilling is a part of the plan, the Operator shall replace overburden and <br /> waste materials in the mined area and shall ensures adequate compaction for stability <br /> and to prevent leaching of toxic or acid forming materials: <br /> No backfilling is anticipated. The final slopes are planned to be mined at 3H: IV or less. If <br /> backfilling is necessary, areas will be backfilled using 6" to 12" lifts, properly compacted <br /> between lifts. <br /> (4) All backfilling and grading shall be completed as soon as feasible after the <br /> mining process. The Operator shall establish reasonable timetables <br /> consistent with good mining and reclamation practices: <br /> This is a borrow operation for a short-term project. The borrow pit is a component of the <br /> project which is expected to be completed in less than 16 months. All backfilling and <br /> grading will be completed within the expected 16 months' timeframe. <br /> (5) All refuse and acid forming or toxic producing materials that have been <br /> mined shall be handled and disposed of in a manner that will control <br /> unsightliness and protect the drainage system from pollution: <br /> No refuse, toxic or hazardous materials are expected to be generated by this mining <br /> operation. However, if such materials are produced, they will be handled in such a manner <br /> that conforms to local, State and Federal requirements for disposal. The Operator will not <br /> dispose of such materials on the mine site. <br /> (9) An Operator may backfill structural fill material generated within the <br /> MLRB permitted area into an excavated pit within the permit area as <br /> provided for in the MLRB Permit. If an Operator intends to backfill inert <br /> structural fill generated outside of the approved permit area, it is the <br /> Operator's responsibility to provide the Office notice of any proposed backfill <br /> activity not identified in the approved Reclamation Plan in accordance with the <br /> provision of Section 3.1.5(9): <br /> At this time, the Operator does not intend to import inert structural fill from off-site. If <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.