My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-17_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2018-08-17_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:22:27 AM
Creation date
9/7/2018 9:18:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
8/17/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL9
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> <br />Task description: Mobilization and Demobilization of Equipment Site: Keenesburg Strip Mine Permit Action: SL9 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION Task #: J02 State: Colorado Abbreviation: None <br />Date: 8/16/2018 County: Weld Filename: C028-J02 <br />User: RAR Agency or organization name: DRMS <br /> <br />EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/unit <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip Cost/hr/ fleet DOT Permit Cost/ fleet <br />Cat D11T - 11U 149.91 $264.52 $125.45 1 $389.97 $125.45 $500.00 <br />CAT 14M 23.57 $60.13 $88.67 1 $148.80 $88.67 $250.00 <br />Subtotals: $538.77 $214.12 $750.00 <br /> <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip Cost/hr/ fleet <br />Fuel Tanker, 6x4, 210 HP $77.51 1 $77.51 $77.51 <br />Lube Truck, 6x4, 250 HP $81.42 1 $81.42 $81.42 Subtotals: $158.93 $158.93 <br /> <br />EQUIPMENT HAUL DISTANCE and Time Nearest Major City or Town within project area region: BRIGHTON <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed: 50.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $4,257.39 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $127.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.