Laserfiche WebLink
Production <br />(tons) <br />Dust Control <br />Uses (gal) <br />Exposed <br />Water <br />Surface <br />(ac) <br />Water <br />Removed in <br />Mined <br />Material <br />Dust <br />Control <br />Net <br />Evaporative <br />Depletions <br />Total <br />Unlagged <br />Depletions <br />Total <br />Lagged <br />Depletions <br />% Call <br />During <br />Month <br />Replacement <br />Requirement <br />Remaining <br />Replacement <br />Requirement <br />Transit Loss <br />Requirement <br />Required <br />Release Leased Water <br />Transit Loss % <br />Assessed on <br />Release <br />Transit Loss <br />Volume <br />Assessed on <br />Release <br />[1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18] <br />August 18 1,667 27,154 15.0 0.05 0.08 7.80 7.93 -4.30 100% 4.30 8.17 0.00 0.00 0.00 0.00 2.00% 0.00 3.87 <br />September 18 1,667 27,154 15.0 0.05 0.08 5.78 5.91 -4.34 100% 4.34 3.46 0.88 0.02 0.90 0.90 2.00% 0.02 0.00 <br />October 18 1,667 27,154 15.0 0.05 0.08 4.04 4.17 -4.37 100% 4.37 -0.70 5.07 0.10 5.17 5.17 2.00% 0.10 0.00 <br />November 18 1,667 27,154 15.0 0.05 0.08 2.31 2.44 -4.24 100% 4.24 -1.13 5.37 0.11 5.48 5.48 2.00% 0.11 0.00 <br />December 18 1,667 27,154 15.0 0.05 0.08 1.73 1.86 -3.96 100% 3.96 -1.08 5.04 0.10 5.14 5.14 2.00% 0.10 0.00 <br />January 19 1,667 27,154 15.0 0.05 0.08 1.73 1.86 -3.65 100% 3.65 -1.00 4.65 0.09 4.75 4.75 2.00% 0.10 0.00 <br />February 19 1,667 27,154 15.0 0.05 0.08 2.02 2.15 -3.41 100% 3.41 -0.93 4.34 0.09 4.43 4.43 2.00% 0.09 0.00 <br />March 19 1,667 27,154 15.0 0.05 0.08 3.18 3.31 -3.26 100% 3.26 -0.82 4.08 0.08 4.16 4.16 2.00% 0.08 0.00 <br />April 19 1,667 27,154 15.0 0.05 0.08 5.20 5.33 -3.26 100% 3.26 -0.10 3.36 0.07 3.43 3.43 2.00% 0.07 0.00 <br />May 19 1,667 27,154 15.0 0.05 0.08 6.93 7.06 -3.48 100% 3.48 2.58 0.90 0.02 0.92 0.92 2.00% 0.02 0.00 <br />June 19 1,667 27,154 15.0 0.05 0.08 8.37 8.51 -3.87 100% 3.87 7.47 0.00 0.00 0.00 0.00 2.00% 0.00 3.60 <br />July 19 1,667 27,154 15.0 0.05 0.08 8.66 8.79 -4.36 100% 4.36 9.80 0.00 0.00 0.00 0.00 2.00% 0.00 5.44 <br />Total 20,000 325,851 - 0.59 1.00 57.75 59.34 -46.50 - 46.50 25.72 33.68 0.69 34.37 34.38 - 0.69 12.91 <br />Notes: <br />[1]Total sand and gravel production in tons. <br />[2]Total dust control water uses in gallons. Dust control water uses considered 100% consumptive. <br />[3]Total maximum exposed groundwater surface area in the pit. <br />[4]Water removed in mined material. Equal to 2% water by weight of material produced. <br />[5]Total dust control water uses in acre-feet. Equal to [2] / 325851. Dust control water uses considered 100% consumptive. <br />[6]Required evaporative replacement based exposed water surface area. Equals exposed water surface area x 3.85 ft x monthly %. <br />3.85 feet = annual net evaporation rate at the site <br />[7]Total unlagged depletions requiring replacement. Equals [4] + [5] + [6]. <br />[8]Total lagged depletion to the Arkansas River. Lagging method described in the SWSP renewal request. <br />[9]Percent days of call during the month. <br />[10]Replacement requirement equal to -[8] * [9]. <br />[11]Consumptive use credit from 2 Rocky Ford Ditch shares. Negative values indicate non-irrigation season net return flow obligations. <br />[12]Remaining replacement requirement after accounting for credit/obligation from Rocky Ford Ditch shares. <br />[13]Transit loss requirement for reservoir release to meet the remaining replacement requirement. <br />[14]Required release equals [12] + [13]. <br />[15]Scheduled release of leased water for Rocky Ford East Pit. <br />[16]Transit loss percent assessed on reservoir release during month. <br />[17]Transit loss volume of water assessed on reservoir release during month. <br />[18]Net impact to the river equals [11] +[15] - [17] - [10]. <br />Month Net Impact <br />to the River <br />Depletions22 West Pit Operations Replacement Requirement <br />Rocky Ford <br />Ditch CU <br />Credit <br />Release of Aurora Replacement Water <br />Table 5a <br />Deep Cut, LLC <br />22 West Pit <br />Projected Operations and Sample Monthly Accounting Summary <br />(all values in acre-feet unless otherwise indicated) <br />Printed On: 5/2/2018 PJB