Laserfiche WebLink
Mr. Paul Bruss, P.E. <br />August 30, 2018 <br />Page 3 of 6 <br />to be 36.59 acre-feet for the period August 1, 2018 through July 31, 2019 and 13.29 acre-feet <br />for the period August 1, 2019 through July 31, 2020. Total lagged depletions for the period <br />August 1, 2018 through July 31, 2019 are 58.74 acre-feet, and total lagged depletions for the <br />period August 1, 2019 through July 31, 2020 are 56.76 acre-feet. (see attached Table 4). <br />REPLACEMENTS <br />Valco will continue to utilize a combination of leased water and historical ditch credits to <br />make replacements to the river. A five-year lease dated August 1, 2017 was obtained to <br />provide replacement supplies during this SWSP approval period from the Upper Arkansas <br />Water Conservancy District ("UAWCD"). The minimum and maximum amounts of leased water <br />for each year of the agreement are shown in the table, below: <br />per' 0 a <br />Min <br />Max <br />August 2017 - hi Iy 2018 <br />75 <br />82 <br />ALqgUst 2019 - Ai IV 201q <br />42 <br />$0 <br />August 2019 - Ju1y X020 <br />15 <br />79 <br />August 2020 - July 2021 <br />6 <br />F� <br />August 2021 • July ZD2 2 <br />3 <br />7c—L <br />Valco owned 2 shares in the Rocky Ford Ditch, which have been transferred to Deep Cut. <br />However, these shares may result in consumptive use credits in excess of what Deep Cut <br />required for this season. Valco may, with approval from Deep Cut and the Division Engineer, <br />use a portion of those shares as part of its SWSP replacement requirement. <br />CONDITIONS OF APPROVAL <br />I hereby approve the proposed SWSP in accordance with Section 37-90-137(11), C.R.S., <br />subject to the following conditions: <br />1. This SWSP shall be valid for the period of August 1, 2018 through July 31, 2020, unless <br />otherwise revoked or superseded by decree. If this SWSP will not be made absolute by <br />a water court action by the SWSP expiration date, a renewal request must be <br />submitted to this office and the Division 2 office (please copy Kathy Trask at <br />Kathy.Trask@state.co.us and Bethany.Arnold@state.co.us) with the statutory fee per <br />gravel pit (currently $257) by June 1, 2020. <br />