My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-22_REVISION - M1977493 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2018-08-22_REVISION - M1977493 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 1:11:04 PM
Creation date
9/6/2018 12:53:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
8/22/2018
Doc Name Note
Part 3 of 3
Doc Name
Request for Technical Revision
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR28
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Plan <br />Appendix T -E <br />Climax Molybdenum Company <br />Geochemical Data <br />Table T -E -4 -Tailing Storage Facility Metals and Additional Parameter Data <br />Shepherd Miller, Characterization of Mine Tailings, Climax Mine, Climax, Colorado. Prepared for Climax Molybedenum Company by Shepherd Miller Inc. January 1997 <br />8 of 8 July 2011 <br />Sample ID <br />Matrix <br />Depth <br />feet <br />pH <br />saturated <br />paste Calcium Potassium Magnesium Sodium Aluminum Arsenic <br />units mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg <br />Antimony Cadmium Chromium Copper Iron <br />mg/kg mg/kg mg/kg mg/kg mg/kg <br />Lead Manganese Mercury Molybdenum Selenium Zinc Residual Sulfur Temp (field) <br />mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg N C <br />N1D-T1-2.5 <br />Surface <br />2.5 <br />2.86 <br />0.06 <br />N1D-T1-4 <br />Surface <br />4 <br />3.54 <br />0.02 <br />N1D-T1-5 <br />Surface <br />5 <br />3.03 <br />N1D-T1-8 <br />Surface <br />8 <br />3.06 <br />N1D-T1-11 <br />Surface <br />11 <br />3.14 <br />N1D-T2-2 <br />Surface <br />2 <br />3 <br />0.02 <br />N1D-T2-3 <br />Surface <br />3 <br />3.08 <br /><0.01 <br />N1D-T2-4 <br />Surface <br />4 <br />3.25 <br />N1D-T2-8 <br />Surface <br />8 <br />3.22 <br />N1D-T2-10 <br />Surface <br />10 <br />3.16 <br />N1D-T3-3.5 <br />Surface <br />3.5 <br />3.06 <br />0.15 <br />N1D-T3-6 <br />Surface <br />6 <br />3.13 <br />0.03 <br />N1D-T3-8 <br />Surface <br />8 <br />3.24 <br />N1D-T3-10 <br />ISurface <br />10 <br />3.25 <br />Shepherd Miller, Characterization of Mine Tailings, Climax Mine, Climax, Colorado. Prepared for Climax Molybedenum Company by Shepherd Miller Inc. January 1997 <br />8 of 8 July 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.