Laserfiche WebLink
(3,278,300 CY) is more than enough to reclaim the entire site, if necessary. Therefore, < <br /> 3,278,300 CY of overburden may be left as excess and will be available to be: sold and <br /> transported off site, applied during final grading of the pit floor, and/or distributed to further <br /> lower the slopes of unseeded pit slope surfaces at the time of final reclamation." <br /> Attachments include: ED <br /> • DRMS AM-1 Garrett Pit 180828 Adequacy Changes.pdf. <br /> • Garrettl80827-C-1 Current Conditions.pdf <br /> • Garrett i80827-C-2 Mine Plan.pdf - <br /> • Garrett 180827-F-1 Reclamation.pdf <br /> • Garrett certified mail receipts—structure agreements.pdf Uv, <br /> • Garrett Structure Agreements—signed by Southway.pdf <br /> 160eZ1 <br /> Please do not hesitate to contact me with questions or concerns. <br /> Regards, <br /> WA* <br /> Katie Todt, P.G. <br /> (314) 704-4505 <br /> Greg Lewicki and Associates <br />