My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-04_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2018-09-04_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 12:42:15 PM
Creation date
9/4/2018 12:29:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
9/4/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
CAM Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />31 <br /> <br /> b) An area under study for designation as unsuitable for surface coal mining operations <br />(2.07.6(2)(d)(ii)); <br /> <br /> c) The boundaries of the National Park System, the National Wildlife Refuge System, <br />the National System of Trails, the National Wilderness Preservation System, the Wild <br />and Scenic Rivers System including rivers under study for designation, and National <br />Recreation Areas (2.07.6(2)(d)(iii)(A)); <br /> <br /> d) Three hundred feet of any public building, school, church, community or institutional <br />building, or public park (2.07.6(2)(d)(iii)(B)); <br /> <br /> e) One hundred feet of a cemetery (2.07.6(2)(d)(iii)(C)); <br /> <br /> f) The boundaries of any National Forest unless the required finding of compatibility <br />has been made by the Secretary of the U.S. Department of Agriculture <br />(2.07.6(2)(d)(iii)(D)). <br /> <br /> The proposed operation (portions of the lease area) is within the boundaries of Grand <br />Mesa, Uncompahgre and Gunnison National Forests. The Secretary of Interior has <br />approved this by indicating that West Elk leases within the Forests are suitable for <br />underground coal mining. Refer to the OSM 1981 Mine Plan Approval, the BLM <br />Report of Coal Unsuitability Criteria and a letter from the U.S. Forest Service dated <br />October 3, 1986, concurring with West Elk's Mining Plan (2.07.6(2)(d)(iii)(D)). <br />Refer also to a letter written by the BLM on March 8, 2005, stating that MCC's plan <br />is adequate to meet all current Federal regulations regarding R2P2. Refer also to the <br />Coal Unsuitability Analysis for Jumbo Mountain Coal Lease, prepared by the <br />Uncompahgre Basin Resource Area of the BLM, which includes an Environmental <br />Assessment. The Apache Rocks Permit Revision is addressed by the U.S. Forest <br />Service in their letter of December 5, 1995, and by the BLM in their letter of <br />November 24, 1995. The Box Canyon Permit Revision is addressed by the U.S. <br />Forest Service in their letter of January 6, 2000, and by the BLM in their letter of <br />December 10, 1999. The South of Divide area (PR-10) is addressed by the U.S. <br />Forest Service in their letter of April 27, 2006. The Dry Fork lease area (PR-12) is <br />addressed by the U.S. Forest Service in their letter of October 15, 2007, and by the <br />BLM in their letter of October 10, 2007. The E-seam methane drainage wells for <br />longwall panels 1 (TR-111) and 2 through 12 (PR-14) are addressed by the U.S. <br />Forest Service in their letter of June 6, 2008. Exploration drilling in Dry Fork Area <br />and on Lion’s Mesa (MR-352) was addressed by the U.S. Forest Service in their <br />memo of May 8, 2009. Revisions to Methane Drainage Wells on panels E3 and E4 <br />(TR-121) were addressed by the U.S. Forest Service in their memo of May 28, 2009. <br />Further revisions to Methane Drainage Wells on panel E3 (TR-123) were addressed <br />by the U.S. Forest Service in their letter of January 3, 2011. Further revisions to <br />Methane Drainage Wells on panel E4 (TR-129) were addressed by the U.S. Forest <br />Service in their letter of June 13, 2012. Revisions to Methane Drainage Wells on <br />panel E5 (TR-130) were addressed by the U.S. Forest Service in their letter of April <br />15, 2013. Revisions to Methane Drainage Wells on panel E6 (TR-135) were <br />addressed by the U.S. Forest Service in their letter of July 22, 2014. Further revisions <br />to Methane Drainage Wells on panel E6 (TR-136) were addressed by the U.S. Forest
The URL can be used to link to this page
Your browser does not support the video tag.