Laserfiche WebLink
<br />12 <br /> <br />TR-136 Revised MDW E6-14-16 Pad Locations 1/27/2015 <br />TR-137 B Seam Longwall Panels Initial Development 7/23/2015 <br />TR-138 Revise MVB E6-14 and E7-1, 3, & 4 Locations/Eliminate Pad E6-16 6/10/2016 <br />TR-139 Reduction of Sites in Hydrology Monitoring Program. 12/1/2016 <br />TR-140 Revised MVB Pad and Road Locations for Longwall Panels E7 and <br />E8 <br />5/26/2017 <br />TR-141 Incidental permit boundary change 6/2/2017 <br />TR-142 Initial SST South Mains Development Mining 1/3/2018 <br />TR-143 Extend Longwall Panel LWE8 1/30/2018 <br />TR-144 In-Mine Exploration 2/12/2018 <br />TR-145 Revised MVB Pad and Road Locations for Longwall Panel E8 6/11/2018 <br />MR-383 Phase 1A RPE East Buttress and Refuse Placement 12/9/2011 <br />MR-384 Update Surface Owners in Exhibit 3 and Map 2 12/9/2011 <br />MR-385 Coal Pad ST-02 Slump Repair Withdrawn <br />MR-386 New well next to existing damaged Box Canyon North (B-Seam) <br />water monitoring well <br />7/24/2012 <br />MR-387 Replace WWTP Polishing Pond with Enclosing Buried Tank. 10/3/2012 <br />MR-388 Temporary Coal Refuse Stockpiles 11/1/2012 <br />MR-389 Modified Phase 1B RPE East Buttress and additional refuse <br />placement. <br />11/30/2012 <br />MR-390 Shed for Chlorine Meter. 11/28/2012 <br />MR-391 Rock quarry for RPEE Phase 1B buttress 5/10/2013 <br />MR-392 Add four power poles at Sylvester Gulch fan bench. 4/23/2013 <br />MR-393 Addition to Nitrogen Building. 5/29/2013 <br />MR-394 Changes to Lower Refuse Pile Drainage 8/1/2013 <br />MR-395 Retaining Wall at RPEE HR-2 Switchback 8/1/2013 <br />MR-396 RPE Minor Drainage Revision. 8/28/2013 <br />MR-397 Steep Slope Seed Mix. Withdrawn <br />MR-398 Updated Exhibit 1 Officers and Directors 11/1/2013 <br />MR-399 RPEE Haul Road Slope Restoration Withdrawn <br />MR-400 RPEE Coble Zone Drainage Pipe 10/9/2013 <br />MR-401 RPEE Drainage Modification. 11/4/2013 <br />MR-402 New Culvert in Ditch at RPE Pond 11/4/2013 <br />MR-403 Temporary Topsoil Pile 1/17/2014 <br />MR-404 Updated Map 51 - E Seam Projected Operations. 6/10/2014 <br />MR-405 Replacement of a Portion of a Culvert Flume at the RPEE with <br />Clay-Lined, Riprap Ditch <br />6/10/2014 <br />MR-406 Ventilation Portal Investigation Boreholes 8/1/2014 <br />MR-407 Midterm Review MT-7 Responses 1/16/2015 <br />MR-408 Updated Exhibit 1 Officers and Directors 3/26/2015 <br />MR-409 Stormwater Recycling Pipeline Project 4/13/2015 <br />MR-410 Updated Officers and Directors List of Exhibits 5/26/2015 <br />MR-411 As-Built and Approved E Seam MVB Pads and Roads. 7/20/2015