Laserfiche WebLink
<br />xvi <br /> <br />WITHIN 80 DAYS OF THE INSTALLATION OF THE STEEL H-BEAM PILES IN THE LOWER REFUSE PILE <br />UNDERNEATH THE COAL PROCESSING PLANT THAT WERE APPROVED IN MR-361, THE OPERATOR SHALL <br />SUBMIT IN A MINOR REVISION UPDATED AS-BUILT DESIGNS OF THE REFUSE PILE AND THE PROCESSING <br />PLANT SHOWING THE STEEL PILES. <br /> <br />STATUS: COMPLIED WITH 8/19/10 BY SUBMITTAL OF MR-367. <br /> <br />