Laserfiche WebLink
<br />xiii <br /> <br />Stipulation No. 63 <br /> <br />DISTURBANCE ASSOCIATED WITH TECHNICAL REVISION NO. 79, PROPOSED TO OCCUR WITHIN 100 FEET OF <br />THE HIGHWAY RIGHT-OF-WAY, SHALL NOT OCCUR UNTIL THE DIVISION HAS RECEIVED DOCUMENTATION <br />FROM THE COLORADO DEPARTMENT OF TRANSPORTATION FOR APPROVAL OF THE DISTURBANCE. <br /> <br />STATUS: COMPLIED WITH 5/29/1997. <br /> <br />Stipulation No. 64 <br /> <br />THE DIVISION APPROVES MINOR REVISION NO. 221 AS A TEMPORARY MEASURE TO ENSURE THAT THE <br />SYLVESTER GULCH CHANNEL REMAINS OPEN TO CONVEY FLOW. THE DIVISION DIRECTS MCC TO SUBMIT A <br />PROPOSED DESIGN FOR REHABILITATION OF THE SYLVESTER GULCH STREAM CHANNEL. THIS SUBMITTAL <br />SHOULD BE IN THE FORM OF AN APPROPRIATE REVISION SUBMITTED TO THE DIVISION NO LATER THAN <br />SEPTEMBER 1, 1997. THE REVISION SHOULD ADDRESS THE CHANNEL CONFIGURATION DURING BOTH THE <br />OPERATIONAL AND RECLAIMED PHASES. <br /> <br />STATUS: COMPLIED WITH 12/5/1997. <br /> <br />Stipulation No. 65 <br /> <br />THE DIVISION SPECIFICALLY DOES NOT APPROVE ADDITIONAL DISTURBANCE TO THE SYLVESTER GULCH <br />STREAM CHANNEL AS A RESULT OF THE TEMPORARY PIPE INSTALLATION. THE DIVISION DIRECTS MCC TO <br />PLACE THE PIPE ONTO THE CHANNEL BOTTOM WITHOUT EXCAVATION IN OR NEAR THE STREAM AND WITHOUT <br />CONSTRUCTING A CORRIDOR FOR THE PIPE AS ORIGINALLY PROPOSED IN MCC’S MINOR REVISION NO. 221 <br />APPLICATION, DATED JULY 11, 1997. <br /> <br />STATUS: COMPLIED WITH 8/19/1997. <br /> <br />Stipulation No. 66 <br /> <br />THE APPLICANT MUST NOT DISCHARGE ANY FLUIDS FROM THE DRILL HOLES OR PIEZOMETERS PROPOSED FOR <br />INSTALLATION WITH MINOR REVISION NO. 226 UNTIL ALL NECESSARY APPROVALS AND/OR PERMITS HAVE <br />BEEN OBTAINED FROM THE COLORADO DEPARTMENT OF HEALTH AND ENVIRONMENT, WATER QUALITY <br />CONTROL DIVISION (WQCD.) THE DIVISION IS APPROVING THE INSTALLATION OF TWELVE (12) <br />BOREHOLES/PIEZOMETERS. ONCE THE NECESSARY APPROVALS HAVE BEEN OBTAINED FROM WQCD, THE <br />DIVISION WILL APPROVE DISCHARGE OF FLUIDS TO AN EXISTING ON-SITE SEDIMENTATION POND. <br /> <br />STATUS: COMPLIED WITH 10/8/1997. <br /> <br />Stipulation No. 67 <br /> <br />WITHIN 60 DAYS OF APPROVAL OF MR225, MCC MUST SUBMIT REVISED MODELS FOR POND MR-2R. THE <br />REVISED MODELS MUST REFLECT THE ADDITION OF DISTURBED AREA WHICH WILL RESULT FROM THE <br />CONSTRUCTION OF THE WATER TANK TOPSOIL PILE. THE REVISED MODELS MUST BE SUBMITTED AS A MINOR <br />REVISION TO THE PERMIT AND MUST BE RECEIVED BY DECEMBER 20, 1997. <br /> <br />STATUS: COMPLIED WITH 2/2/1998 BY THE SUBMITTAL OF MR-235. <br /> <br />Stipulation No. 68 <br /> <br />WITHIN 90 DAYS OF CONSTRUCTION OF THE SUBSURFACE DRAINAGE STRUCTURES PROPOSED IN MINOR <br />REVISION NO. 239, MCC SHALL SUBMIT DESIGNS FOR THE POND MB-1 SURFACE DRAINAGE SYSTEM WHICH <br />INCLUDES FLOW FROM THE SUBSURFACE DRAINAGE SYSTEM. <br /> <br />STATUS: COMPLIED WITH 5/13/1999.