Laserfiche WebLink
<br />vii <br /> <br />This stipulation was never used. No stipulation No. 27 exists. <br /> <br /> <br /> <br />Stipulation No. 28 <br /> <br />MCC OR ANY SUCCEEDING OPERATOR OF THE WEST ELK MINE MUST CONTINUE TO SUBMIT TO THE DIVISION <br />AN ANNUAL HYDROLOGIC REPORT. THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL HYDROLOGIC DATA <br />GATHERED DURING THE YEAR, AN ASSESSMENT OF THE IMPACTS OF MINING DURING THE YEAR, AND AN <br />ESTIMATE OF THE PROJECT IMPACTS OF MINING IN THE FOLLOWING YEARS. THIS REPORT SHALL ASSESS THE <br />IMPACTS OF MINING ON THE QUALITY AND QUANTITY OF WATER IN THE SURFACE STREAMS, SPRINGS, <br />GROUNDWATER AQUIFERS, MINE INFLOW AND MINE DISCHARGE. <br /> <br /> STATUS: TERMINATED 5/28/1992. <br /> <br />Stipulation No. 29 <br /> <br />WITHIN NINETY DAYS (90) OF APPROVAL OF THE LOWER WASTE PILE PERMIT REVISION, MCC SHALL SUBMIT <br />A REVISED WATER MONITORING PLAN THAT INCLUDES MONITORING OF THE WASTE PILE. THE PLAN SHALL <br />INCLUDE DIRECT SAMPLING OF THE SEDIMENT POND AND UNDERDRAIN DISCHARGE TWICE PER YEAR DURING <br />THE SECOND AND THIRD QUARTER OF THE YEAR. THE PARAMETERS SHALL BE THE FULL LIST OF CHEMICAL <br />CONSTITUENTS, AT LEAST FOR THE FIRST YEAR. MCC MAY REQUEST AN ADJUSTMENT OF THE MONITORING <br />REQUIREMENTS AFTER THE FIRST YEAR, DEPENDING ON THE RESULTS OF THE MONITORING. <br /> <br /> STATUS: COMPLIED WITH 5/19/1986. <br /> <br />Stipulation No. 30 <br /> <br />MCC MUST SUBMIT ADDITIONAL BOND IN THE AMOUNTS DESCRIBED IN THE LOWER WASTE PILE PERMIT <br />REVISION APPLICATION, AT LEAST THIRTY (30) DAYS PRIOR TO THE COMMENCEMENT OF THE CONSTRUCTION <br />OF PHASES III, IV, AND V OF THE LOWER WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND <br />ACCEPTED BY THE DIVISION PRIOR TO THE CONSTRUCTION OF THESE PHASES. <br /> <br />STATUS: TERMINATED 5/28/1992. <br /> <br />Stipulation No. 31 <br /> <br />MCC SHALL FORWARD FIVE (5) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAY’S WRITTEN <br />APPROVAL FOR ACTIVITIES WITHIN 100 FEET OF THE OUTSIDE RIGHT-OF-WAY OF THE COLORADO HIGHWAY <br />133 WITHIN THIRTY (30) DAYS OF THE APPROVAL OF THE PERMIT REVISION APPLICATION. <br /> <br />STATUS: COMPLIED WITH 5/19/1986. <br /> <br />Stipulation No. 32 <br /> <br />THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE FIRST PANEL TO BE <br />SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY GROUNDWATER LEVEL DATA AND WATER QUALITY DATA PRIOR TO MINING THIS PANEL. <br /> <br />STATUS: COMPLIED WITH 7/18/1993. <br /> <br />Stipulation No. 33 <br /> <br />SHOULD THE APPLICANT ENCOUNTER MORE GROUNDWATER THAN ANTICIPATED, PRIOR TO THE DISCHARGE <br />OF EXCESS MINE WATER THE APPLICANT SHALL PROVIDE AN ANALYSIS OF ANTICIPATED WATER QUALITY <br />AND QUANTITY, AND AN ASSESSMENT OF THE EFFECTS ON THE RECEIVING STREAM.