Laserfiche WebLink
88. Mayfower Flood Bypass Tunnel $530,000 <br />89. 5 -Dam Powerline $1,948 <br />90. Raw Water Tank $10,732 <br />91. Mill Water Tank $10,732 <br />92. Mayflower Cyclone Station $1,224 <br />B. The Asphalt Road and Lot Demolition cost estimate ($473,388) under Demolition 2 -Linear Facilities <br />has been deleted since it is included in the reclamation cost for the Mine Mill Complex. <br />C. The Mine Mill Complex cost estimate has been revised to include general regrading of 370,000 CY <br />followed by placement of a 1 -foot thick soil cover over 229 acres of disturbance. Demolition of <br />associated structures and revegetation are included elsewhere in the cost estimate. <br />41 Page <br />