My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-31_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2018-08-31_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 1:06:24 PM
Creation date
8/31/2018 1:02:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
General Documents
Doc Date
8/31/2018
Doc Name
Revised Financial Warranty Update
From
Climax Molybdenum
To
DRMS
Permit Index Doc Type
General Correspondence
Email Name
JLE
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
88. Mayfower Flood Bypass Tunnel $530,000 <br />89. 5 -Dam Powerline $1,948 <br />90. Raw Water Tank $10,732 <br />91. Mill Water Tank $10,732 <br />92. Mayflower Cyclone Station $1,224 <br />B. The Asphalt Road and Lot Demolition cost estimate ($473,388) under Demolition 2 -Linear Facilities <br />has been deleted since it is included in the reclamation cost for the Mine Mill Complex. <br />C. The Mine Mill Complex cost estimate has been revised to include general regrading of 370,000 CY <br />followed by placement of a 1 -foot thick soil cover over 229 acres of disturbance. Demolition of <br />associated structures and revegetation are included elsewhere in the cost estimate. <br />41 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.