Laserfiche WebLink
Table 3. SL -11 Releasable Amount <br />Task <br />$ <br />Cost <br />Doze Poly 1D D-15 (Map 35A - WP024) <br />$ <br />31,360.00 <br />Doze Poly ID D-16 (Map 35A - WP024) <br />$ <br />73,091.00 <br />Doze Poly 1D D-17 (Map 35A - WP024) <br />$ <br />44,732.00 <br />Doze Poly ID D-18 (Map 35A - WP024) <br />$ <br />14,266.00 <br />Doze Poly 1D D-19 (Map 35A - WP024) <br />$ <br />114,137.00 <br />Doze Poly ID D-20 (Map 35A - WP024) <br />$ <br />67,603.00 <br />Doze Poly ID D-21 (Map 35A - WP024) <br />$ <br />42,070.00 <br />Doze Poly ID D-22 (Map 35A - WP024) <br />$ <br />43,201.00 <br />Doze Poly ID D-23 (Map 35A - WP024) <br />$ <br />213,604.00 <br />Doze Poly ID D-24 (Map 35A - WP024) <br />$ <br />51,590.00 <br />Doze Poly ID D-25 (Map 35A - WP024) <br />$ <br />195,611.00 <br />Scaper Poly ID S-28 (Map 35A - WP024) <br />$ <br />107,749.00 <br />Scaper Poly ID S-29 (Map 35A - WP024) <br />$ <br />17,853.00 <br />Scaper Poly ID S-30 (Map 35A - WP024) <br />$ <br />22,319.00 <br />Scaper Poly 1D S-31 (Map 35A - WP024) <br />$ <br />94,851.00 <br />Scaper Poly ID S-32 (Map 35A - WP024) <br />$ <br />63,584.00 <br />Rip ST005 (MR165) <br />$ <br />788.00 <br />Regrade GFO1 <br />$ <br />5,204.00 <br />Backfill WR -1 thru WR -4 (TRI 10) <br />$ <br />94.12 <br />Demo Main Admin Building (GFO1) <br />$ <br />65,085.47 <br />Haul Topsoil from Pile 15B to WP024 <br />$ <br />82,086.00 <br />Haul Topsoil from Pile 16A to WP024 <br />$ <br />82,086.00 <br />Regrade Topsoil at EP060 <br />$ <br />2,206.00 <br />Regrade Topsoil at GFO1 <br />$ <br />1,665.00 <br />Regrade Topsoil at CO 1, CO2, and C05 <br />$ <br />294.00 <br />Reseed Disturbance w/SL13 <br />$ <br />57,525.00 <br />Subtotal of direct costs (rounded to nearest dollar) <br />$ <br />1,494,654.00 <br />Indirect Costs (rounded to nearest dollar) <br />$ <br />303,500.00 <br />Total Amount <br />$ <br />1,798,154.00 <br />60% of Total Amount (Phase I) <br />$ <br />1,078,892.40 <br />Remaining Required Liability for Entire Colow o Mine <br />$ <br />106,986,552.00 <br />Liability Held by Division Post SL -13 <br />$ <br />106,946,829.00 <br />Difference <br />$ <br />39,723.00 <br />SL -13 Releasable Amount (rounded to nearest dollar) <br />$ <br />1,039,169.00 <br />Proposed Decision and Findings of Compliance August 30, 2018 <br />Partial Phase I Bond Release SL -13 Page 10 <br />