Laserfiche WebLink
Monument Dam <br />Inspection Form <br />Date: 30n1ed <br />Time: /,* 30 <br />Name of Inspector: PjI'vE ���� CoC <br />Current Parcel Being Mined: <br />❑ Weekly Inspection �Nlonthly Inspection <br />Yes No <br />❑ � Is mining within 1 mile of Monument Dam? <br />❑ Are there visible surface cracks on the dam? <br />If yes, indicate length and size of crack. <br />❑ 5�-� Is there evidence of subsided areas on or around the dam? <br />If yes, indicate where and degree. <br />❑ � Are there bulges on the dam? <br />If yes, indicate where and degree. <br />❑ j2-- Are there signs of seeps on the dam? <br />If yes, indicate where and estimated flow. <br />❑ Are there any other potentially damaging features on the dam? <br />If yes, describe. <br />❑ p--- Are there any recent evidences of slope failure on the landside south of the <br />dam (perform visual inspection and data analysis of inclinometers)? <br />If yes, describe. <br />Notes: <br />7 <br />Signature of Inspector: <br />Inspections are perform�d under the direction of Mike Peacock, P. E. <br />If cracks or other potentially damaging features occur, notify Mike Peacock or Kathy <br />Welt immediately. <br />(WAMCC-Engineering\ENV PERNIITTING\REG AGENCIES\CDRMS\Monument DarnNonument Dam Inspection Procedure\Monument Dam Inspection Form) <br />