Laserfiche WebLink
Colorado Alabaster Supply CAS Quarry Reclamation Man Map <br /> Permit#M-89-07,7 <br /> ,ex Augrust eats <br /> a x,e•�� �.i _ma's-Y. ,._"g K "� ,� <br /> -40 <br /> `-- �-I» • - fi ..its `X 'q]� ii, <br /> y I" <br /> _ �♦� '.k j y 5 Amy,n2•� � o` <br /> 4;• a <br /> . ' tOF 4 <br /> _ r <br /> �• v. fey "a x <br /> s § 1 t •�_ s <br /> A-Current&projected working area <br /> B-Soil Stockpile <br /> C-Waste Stockpile <br /> D-Dig Area <br /> E-Product Stockpile <br /> F-Direction in which mineral extraction will proceed <br /> G-Permit Sign <br /> H-Existing ranch road <br /> Reclamation Plan <br /> Each year after quarrying, we will smooth down areas that we no longer need for operation purposes into a gentle <br /> slope, in general these slopes will be 4:1 or less. In our operation we will backfill the deposit to protect it from cracking <br /> and weathering. These backfilled areas are steeper, approx. 3:1. We will then cover the area that is no longer needed <br /> with the stockpiled soil at 12"-14". Vegetation will be seeded according to the recommendation of the Soil <br /> Conservation Service as outlined in our original reclamation plan. <br /> 2010 —Activity in the area within the area between 'B, D, & E" <br /> 2011 —No activity due to weather and scheduling issues <br /> 2012 —Activity in the area within the area between "B, D, & E September 27th and 29th <br /> 2013—Activity in the area within the area between "B, D, & E" October 25th and 26th. <br /> 2014 --Activity in the area within the area between ''B, D, & E" September 171h and 18`h. <br /> 2015 --Activity in the area within the area between "B, D, & E" September 25th and 26" <br /> 2016 —Activity in the area within the area between "B, D, & E" September 24th. <br /> 2017—Activity planned for late September, possibly early October, again in the same area as 2016 <br /> 2018 — No activity in 2017 due to health issues Planning again for late September early October in same area <br />