Laserfiche WebLink
C) <br /> RPM,Inc. <br /> Other Questions Sent the Applicant: <br /> We believe the map permit area description is the correct. We plan to remark the entire permit <br /> area once the Conversion Application is approved based on the Conversion Application meets <br /> and bounds. <br /> The Division of Water Resources Applicant responses: <br /> 1. We will not expose groundwater. If any ground water is exposed,we will cover the area of <br /> ground water exposure with at least 2 feet of cover. <br /> 2. No storm water will be retained on site. We believe the proposed control of storm water by <br /> the New Jersey barriers will comply with the provisions of Urban Drainage and Flood Control <br /> District Memorandum which lays out the compliance provisions of Senate Bill 15-212, <br /> provisions 1-4. In addition,we will use the notification system provided by the Division of <br /> Water Resources to notify all parties on the substitute water supply plan notification email list, <br /> prior to installation and use. <br /> Following are our responses to the Division's adequacy questions: <br /> Item 1.6 Public Notice: <br /> Question 1. As required by Rule].6.2(d) and 1.6.5(2),please submit proof ofpublication in a <br /> newspaper of general circulation in the locality of the proposed mining operation. <br /> 2 <br />