My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-27_PERMIT FILE - M2001056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2001056
>
2018-08-27_PERMIT FILE - M2001056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:22 PM
Creation date
8/27/2018 4:16:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001056
IBM Index Class Name
PERMIT FILE
Doc Date
8/27/2018
Doc Name
Adequacy Review Response
From
RPM, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> RPM,Inc. <br /> Stormwater Management Plan <br /> Method Statement <br /> Erosion Control Inspection and Maintenance <br /> August 19,2018 <br /> Located in Elbert County,Colorado <br /> 1.0 Purpose: <br /> A plan to implement erosion control and maintenance for a sand and gravel mining <br /> operation in order to satisfy the requirements of the Colorado Department of Public <br /> Health and Environment. A permit for a Stormwater discharge will be submitted to the <br /> Colorado Water Quality Control Division prior to the Beveal Pit expansion. <br /> 2.0 Responsibility: <br /> Elbert County <br /> Contact: Mr. Sam Albrecht, County Manager <br /> PO Box 7 <br /> Kiowa, CO 80117 <br /> Phone: 303-621-3106 <br /> 3.0 Potential Pollutant Sources: <br /> Potential Pollution Source: Potential for Contribution to Best Management Practice for <br /> Storm Water: Control: <br /> In pit activity Storm water runoff from pit Sediment trap at the low end of the <br /> pit,meant to slow down flows to <br /> drop out sediment. <br /> Topsoil and overburden stockpiles Only during veg establishment Place runoff controls,such as straw <br /> bales or other similar controls along <br /> the down gradient toe of the <br /> stockpile. <br /> Product stockpiles Very low potential since the product No controls necessary at this time <br /> is sand,gravel or combination <br /> Areas under reclamation Low potential since the duration of Seed and mulch the area after topsoil <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.