My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-24_REVISION - M1981202SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981202
>
2018-08-24_REVISION - M1981202SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:39:44 PM
Creation date
8/24/2018 4:30:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
REVISION
Doc Date
8/24/2018
Doc Name
Request for Surety Reduction
From
Flag Resources
To
DRMS
Type & Sequence
SR1
Email Name
ACY
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLAG RESOURCES, INC. SILT PIT <br /> M.L.R.B. Permit# M-81-202SG August 22, 2018 <br /> BOND REVALUATION AND REDUCTION REQUEST <br /> This request is to reevaluate and if appropriate reduce the current bond for the <br /> Flag Resources, Inc. - Silt Pit that is currently $468,320. The current bond is <br /> coming up for renewal in October and we would like to have this reduction done in <br /> time to replace the current bond with a new lower one. <br /> The attached Bond calculation information is based on the Divisions last cost <br /> summary worksheet dated 8/23/2017. It shows the current volumes of material <br /> needing to be moved, and the areas needing some reclamation work. Basically we <br /> are keeping the maximum area of disturbance area at 50 acres would need seeding, <br /> 40 acres would need resoiling and seeding or which 30 acres would need ripping <br /> prior to resoiling. Since the last bond evaluation much of the work along the <br /> eastern lake has been complete so some of the tasks outlined for areas in the <br /> future lake area have been completed. In particular the bank sloping around the <br /> east lake area is complete, topsoil is stored around the slope area and dewatering <br /> is not needed at this time. <br /> The Tasks taken out of the bond estimate are: <br /> 02a Dewatering east lake to allow grading <br /> 03a Transport of backf ill material <br /> 03b Grading of Slopes <br /> The revised tasks are: <br /> 05a Transport of half of topsoil - the methodology used to is revised to use <br /> 631 Cat scrapers to load, transport and <br /> rough spread the topsoil instead of using off <br /> road trucks, loaders and dozers. <br /> 06a Reveg. all disturbed areas not <br /> to be pond - Trees were removed in TR06 so the associ- <br /> ated cost to plan was subtracted from the <br /> estimate. <br /> 07a Initial mobilization - revised to removed resoiling equipment no <br /> longer needed due to change in task 05a. <br /> The unchanged tasks are: <br /> 01a Demo of cement and remove debris <br /> 04a Rip compacted areas <br /> 05b Grade half of topsoil <br /> 07b Initial mobilization <br />
The URL can be used to link to this page
Your browser does not support the video tag.