Laserfiche WebLink
Page 10 of 16 <br />Haul Route: 100 0.00 3.00 3.00 0.0564 (Cat HB) <br />Return Route: 100 0.00 3.00 3.00 0.0564 (Cat HB) <br />Total Travel Time: 0.1128 minutes <br />Total Cycle Time: 0.5028 minutes <br />Load Bucket Capacity <br />Rated Capacity: 1.80 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: 1.98 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: 236.28 <br />Adjusted Hourly Unit Production: 186.30 <br />Adjusted Hourly Fleet Production: 186.30 <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: <br />Unit cost: $0.390 /LCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />1.74 Hours <br />$127 <br />CIRCES Cost Estimating Software <br />