My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2018-08-20_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2018 7:18:32 AM
Creation date
8/22/2018 10:49:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
8/20/2018
Doc Name
Cost Estimate
From
Tabetha Lynch
To
Clayton Wein
Type & Sequence
SL11
Inspection Date
8/20/2018
Email Name
TNL
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: TR69 <br />Site: Roadside Portals <br />PROJECT IDENTIFICATION <br />Page 8 of 16 <br />COMPACTION WORK <br />cting fill in excavated hole <br />Permit Action: SLI 1 <br />Task #: 213 State: Colorado <br />Date: 8/13/2018 County: Mesa <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job#: C1981041 <br />Abbreviation: None <br />Filename: 213 <br />Basic Machine: CAT 825H <br />feet <br />Horsepower: 354 <br />Compactor Type: Soil - tamping foot <br />3.00 <br />Shift Basis: 1 per day <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />Data Source: (CRG) <br />Cost Breakdown: <br />179.46 <br />CCY/hour <br />Site Altitude: <br />5,100 feet <br />Utilization % <br />Ownership Cost/Hour: <br />$107.39 <br />NA <br />Operating Cost/Hour: <br />$80.24 <br />100 <br />Operator Cost/Hour: <br />$31.65 <br />NA <br />Total Unit Cost/Hour: <br />$219.28 <br />Total Fleet Cost/Hour: <br />$219.28 <br />MATERIAL OUANTITIES <br />Loose volume: 1,100 <br />Compacted volume: 963 <br />Source of estimated volume: <br />Source of estimated shrinkage factor: <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />LCY Shrinkage factor: 0.875 <br />CCY <br />TR69 SCC estimate <br />Cat Handbook <br />Unadjusted hourly production = (W x S x L x C) / P <br />7.34 <br />feet <br />1.00 <br />mph <br />3.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />2 <br />passes <br />179.46 <br />CCY/hour <br />Site Altitude: <br />5,100 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 148.95 <br />Adjusted Hourly Fleet Production: 148.95 <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $1.472 per CCY <br />CCY/Hour <br />CCY/Hour <br />Total job time: 6.46 Hours <br />Total job cost: $1,417 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.