My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-21_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-08-21_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2018 9:06:23 AM
Creation date
8/22/2018 7:49:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/21/2018
Doc Name Note
Adequacy Review & Cost Estimate
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR122
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont’d Task # 000 Page 2 of 5 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Task description: Regrade Haul Road A Upper Ditch <br />Site: Colowyo Coal Mine Permit Action: TR122 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 8/21/2018 County: Moffat Filename: C019-001 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $242.84 NA <br />Operating Cost/Hour: $200.83 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.52 NA <br />Total unit Cost/Hour: $485.19 <br />Total Fleet Cost/Hour: $485.19 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 240 <br />Swell factor: 1.000 <br />Loose volume: 240 LCY <br />Source of estimated volume: Exhibit 7-23B, Table 1, Exh. 7-item 23, Fig. B-1 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly <br />production: <br />4,589.5 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />-10 % <br />Average site altitude: 7,500 feet <br /> <br />Material weight: 2,650 lbs/LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.