Laserfiche WebLink
DESERADO MINE <br /> BLUE MOUNTAIN ENERGY <br /> 3607 County Rd. 65 <br /> Rangely, CO 81648 <br /> (970)675-4300 <br /> fax(970)675-4399 <br /> August 16, 2018 <br /> RECEIVED <br /> Mr. Clayton Wein <br /> Division of Reclamation, Mining and Safety AUG 21 2018 <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 Division of Reclamation, <br /> Mining&Safety <br /> RE: Minor Revision #174—N2 line update. <br /> Dear Clayton: <br /> Enclosed is a revised minor revision (MR-174) requesting an update to the N2 line routing and <br /> inclusion of the SH-4 HDPE waterline. <br /> The update to the N2 line routing and waterline additions do not increase the amount of N2 line <br /> (HDPE pipe)beyond that which is already permitted and bonded for. <br /> The new routing for the N2 and waterlines follow previously approved road and drilling <br /> disturbances. Thus, all archeological and biological analyses have already previously been <br /> completed. <br /> If you have any further questions please contact me at 970-675-4322. <br /> Sincerely, <br /> Scott Wanstedt <br /> Environmental Engineer <br /> swanstedtO deserado.com <br /> enc: <br /> cc: Jeff Dubbert <br /> Jennifer Maiolo—BLM <br />