Laserfiche WebLink
Aggregate Industries-WCR, Inc. <br /> Inert Material Acceptance Police, General Conditions <br /> b. Unless contaminated materials are easy to visually identity, soil samples <br /> will have to be taken to document that all contamination is removed and <br /> the receiving site is clean. <br /> III. A record of the quantity of material brought in (tons/yards)/number of loads <br /> delivered must be recorded. <br /> IV. Concrete must have been in a hardened state for at least sixty (60) days prior <br /> to placing in a fill area. <br /> V. Asphalt must be placed a minimum of three (3) feet above the groundwater <br /> table. <br /> Page 2 of 2 <br />